OM1 — Flexible Modular Housing

Awarded Modular Housing designed by Peter Stutchbury

Slideshow

Awarded

Modular

Housing

Designed

BY

PETER

STUTCHBURY

How it works - Steps + Services

1. Explore & Configure

Use our online configurator to explore design options and costs. Prices shown provide a cost guide for materials, licence to assemble, and recommended assembly fees. Start with a base unit and customise to your site and needs. A provisional assembly schedule & labour allowance guide is available. Further refinements are presented during design consultation.

2. Schedule a Call or Experience

Introductory call to answer questions, explain our process, and assess how Dimensions X fits your needs.
Cost: Free
Book call

Visit prototypes at Krinklewood (OM1, PS1, MS1) or explore virtually:

3. Book Design Consultation

Submit and order your OM1 design.

  • Cost: $2,500+gst

Consultation includes:
3.1 Phone Call or Site Visit (additional fee)

Phone call 

  • Review client brief (0.5hr meeting)

Site Visit (additional fees apply)

  • Review client brief on site (1 hr meeting)
  • Advise on location & orientation
  • Locate reference set-out points

Additional fee: $160/hr (out of office, Coffs Harbour based) + Travel: $0.88/km (2025 ATO mileage) + tolls

3.2 Preliminary Brief (Allow minimum 14 days)

  • DimX sends revised online configurator / schematic design brief floor & site plan
  • 30-minute review meeting (Zoom or PS Architecture office)
  • Approval with comments or changes

To complete the council-required drawings, you must first obtain the following reports;

3.3 Survey & Geotech Report (client-obtained)
Survey Requirements:

  • Contours, boundaries, set out pegs (pdf and dwg cad file)
  • Neighbouring buildings outline with heights, Trees, existing services, major site features (these requirements are only necessary if in proximity with the proposed building and/or if relevant to the development application requirements by Council)

Geotech Report:

  • Soil classification, depth, bearing capacity, moisture, boreholes

4. Design Sign-off

4.1 Design Sent for Approval

  • Return design sent for approval & final sign-off
  • Additional changes charged at $160/hr

4.2 Architectural Drawings for Council (Allow minimum 14 days)

  • Cost: $3,500+gst
  • Includes: one site & analysis plan, one floor plan, four elevations, one section & material schedule
  • Council request for additional drawings charged at $160/hr
  • Also includes standard Electrical and Plumbing plan (to be prepared & reviewed after DA submission)

Not Inclusive Of

  • Shadow diagram

4.3 Architectural Drawings for Construction Certificate (Allow minimum 14 days)

  • Cost: Included on DA Package
  • Includes: additional annotations to current DA set
  • Certifier request for additional drawings or changes charged at $160/hr
5. Council Approvals

Dimensions X partners with town planners (Approved) and private certifier (Build Cert) for council approvals.

5.1 Step 1 – Preliminary Planning Assessment (exc. GST)

  • Checks site restrictions & setbacks
  • Confirms if DA/Planning Permit (VIC) or CDC required
  • Summarises external report needs

Fees:

  • Project Set Up Fee: $300
  • Approval Pathway Analysis (APA): $500
  • Feasibility Assessment (FA): $1,500
  • Dimensions X Account Management +15%: $345

5.2 Pathway 1 – Your site requires a Development Application (DA) / Planning Permit (VIC)

Dimensions X commissions Approved to manage your DA / Planning Permit.
A summary of likely costs and steps are detailed below.
All costs exclude GST.

Fees

  • Approval Management & Lodgement: $500
  • Planning / Design Review: $750
  • Consultant Coordination (per engagement): $250
  • SEE / VIC Planning Report (inc. waste management): $2,000
  • Council RFI (per hour): $190
  • Waste Management Plan: $200

Dimensions X Account Management

  • 15% of total cost

Disbursements (paid to third parties)
Fynd (NSW)

  • Certificate of Title, Instrument 88B & Deposited Plan: $75
  • Section 10.7 Planning Certificate: $105*

Land Title Information (VIC)

  • Copy of Title: $7.80
  • Copy of Plan: $7.50
  • Electronic Instruments: $5.60 each
  • Planning Certificate: $7.82

Government & Authority Fees

  • NSW Government Application Fees (Mod DA): $45.20
  • Council Application Fees (NSW & VIC): POA
  • VIC Government Fees: POA

Disclaimers

  • FYND & some council fees may increase.
  • Council fees charged per quotes obtained.

5.3 Pathway 2 – Your site requires a Complying Development Certificate (CDC)

If eligible for CDC, Build Cert manages approvals. A summary of likely costs and steps are detailed below. All costs exclude GST.

Preliminary Complying Development Assessment

  • $250

Fee Schedule (includes site inspections)

  • Construction Certificate Fees: $2,220
  • Complying Development Certificate: $2,430
  • Additional Development on Same Approval (e.g. retaining walls): $670

Mandatory Government Application Fees

  • NSW Government Application Fee (per CC & OC): $46
  • NSW Government Archival Fee (per CDC, CC & OC): $47

Required Disbursements

  • Section 10.7 (2) Planning Certificate: $120
  • Certificate of Title: $35
  • Deposited Plan (DP), Instrument 88B: $55

Ancillary Services (NSW, per engagement)

  • Documentation / Consultant Coordination: $250 per consultant

Dimensions X Account Management

  • 15% of total cost

5.4 External Reports

Additional reports may be required (Bushfire, BASIX, etc.) at extra cost, as determined by certifier or planner.

5.5 Plan Updates & Annotations

Council may request updates to architectural plans.
Hourly rate: $160/hr

6. Contract Signed

After DA/CDC submission:

  • Contract secures licence & materials for assembly
  • Configuration & material summary provided for review and approval of scope
  • Options: licensed builder or owner builder
  • Materials sent with assembly schedule, manual, and recommended labour allowance
7. Approval & Start of Works
  • Surveyor locates footing set out for contractor + Install footings (2 days)
  • CLT production: 12–16 weeks
  • Assembly & construction: Proven 3–8 weeks (dependent on scope, site, weather)

Your home. Your way.

Design your dream home in an afternoon.

Get started

See it before you build it. Book a stay in Dimensions X at Krinklewood organic + biodynamic vineyeyard in Broke, Hunter Valley.

The best way to understand an OM1 is to spend a night in one. Our prototype at Krinklewood in the Hunter Valley is available for site visits and overnight stays — so you can feel the quality of the structure, test the space, and make your decision with confidence.

Book your stay